Minimalist IAS
2019 GS Paper II

UPSC CSE (Main) 2019 · GS Paper II · Question 8

Implementation of Information and Communication Technology (ICT) based Projects/Programmes usually suffers…

Syllabus line: Governance, transparency & e-governance — “Important aspects of governance, transparency and accountability, e-governance- applications, models, successes, limitations, and potential; citizens charters, transparency & accountability and institutional and other measures.”

GS Paper II 2019 · Q8

10 marks · 150 words Governance, transparency & e-governance

Implementation of Information and Communication Technology (ICT) based Projects/Programmes usually suffers in terms of certain vital factors. Identify these factors, and suggest measures for their effective implementation.

Approach · directive: “identify / suggest”

What it asks · Two parts: identify the recurring weaknesses in ICT-based government projects and suggest measures for effective implementation.

The question has 2 parts — answer each

  1. Identify the vital factors on which ICT-based projects and programmes usually suffer
  2. Suggest measures for their effective implementation, matched to those factors

Open with · Many e-governance projects computerise old procedures without changing them, and fall short on connectivity, skills, integration and user needs.

Cover

  • Access gaps: patchy power and connectivity, language barriers and low digital literacy leave many users, especially in rural areas, unable to use services.
  • Design flaws: old procedures are merely computerised, not re-engineered; systems are poorly user-centred, and lack of interoperability and common data standards creates departmental silos.
  • Capacity and change management: shortage of trained staff, weak leadership, resistance to transparency and frequent transfers of project heads stall adoption.
  • Funding and procurement: poor project planning, cost overruns, vendor lock-in and no budget for maintenance after rollout lead to abandoned or underused systems.
  • Security and inclusion: cyber threats, data leaks and weak data protection erode trust, and authentication failures can exclude genuine beneficiaries.
  • Measures on design and governance: re-engineer processes (e-Kranti made process re-engineering mandatory in every mission mode project), integrate services into single windows ('integrated services, not individual services'), adopt open standards and interoperability, and use outcome-based contracts with maintenance budgets.
  • Measures on access and trust: BharatNet and Common Service Centres for connectivity and service delivery, digital-literacy drives such as PMGDISHA (2017); local-language interfaces, offline options, data-protection and cyber safeguards, and third-party audit.

Close with · Technology succeeds when process reform, skills, secure infrastructure and citizen-centred design come first; only then does ICT become governance change and not merely automation.

Question: UPSC's CS (Main) 2019, GS Paper II — paper ↗. Approach: Minimalist IAS, checked 30 Sept 2026 (how we verify) — UPSC publishes no model answers. ·

Model answer · 214 words (UPSC limit 150) · Minimalist IAS

Many e-governance projects computerise old procedures without reforming them and stumble on connectivity, skills, integration and user needs: technology is bolted onto governance rather than changing it.

Where projects suffer

  • Access: patchy power and connectivity, English-only interfaces and low digital literacy leave rural and poor users unable to use services.
  • Design: processes are automated as they are, not re-engineered; systems are built around departments, not citizens, and missing data standards create silos.
  • Capacity and change management: too few trained staff, weak leadership, resistance to transparency and frequent transfers of project heads.
  • Funding and procurement: poor planning, cost overruns, vendor lock-in and no maintenance budget leave systems abandoned after launch.
  • Security and inclusion: data leaks and cyber threats erode trust; authentication failures exclude genuine beneficiaries.

Measures

  • Reform before automation: e-Kranti makes process re-engineering mandatory in every mission-mode project; deliver integrated services through single windows on open standards.
  • Reach: BharatNet for connectivity, Common Service Centres for assisted access, PMGDISHA (2017) for digital literacy, local-language interfaces and offline options.
  • Sustain: outcome-based contracts with maintenance budgets, stable project teams and staff training.
  • Trust: data-protection and cyber safeguards, third-party audits and grievance redress for failed authentication.

ICT delivers governance change only when process reform, skills, secure infrastructure and citizen-centred design come first; otherwise it merely automates the old bottlenecks.

Written by Minimalist IAS from facts checked at source (how we verify) — a little fuller than exam length, so every part of the question is covered; in the hall, keep the structure and trim the detail. UPSC publishes no model answers: compare your structure and coverage with this, then write your own.

Also asked on this syllabus line

All questions on Governance, transparency & e-governance →

Build the base: Prelims PYQs on this