Not many years ago, river linking was a concept but it is becoming a reality in the country. Discuss the advantages of river linking and its possible impact on the environment.
Approach · directive: “discuss”
What it asks · Discuss the benefits of interlinking rivers and the environmental risks that come with moving water between basins.
It asks 2 things — answer each
- Discuss the advantages of river linking
- Discuss its possible impact on the environment
Open with · Historical opening: the National Perspective Plan (1980) identified 30 links, 14 Himalayan and 16 peninsular, to move water from surplus to deficit basins; in December 2021 the Cabinet approved the first, Ken-Betwa, at Rs 44,605 crore.
Cover
- Irrigation and drought relief: Ken-Betwa alone promises 10.62 lakh hectares in drought-prone Bundelkhand, from Panna to Jhansi.
- Flood moderation: storages and diversions on the Ganga-Brahmaputra system can reduce floods in Bihar, Assam and eastern Uttar Pradesh.
- Other gains: drinking water for 62 lakh people and 103 MW hydropower in Ken-Betwa; navigation, groundwater recharge and industrial supply elsewhere.
- Ecological cost: dams and canals submerge forests and displace people; the Ken-Betwa reservoir lies in the Panna tiger landscape.
- River health: changed flows, less silt and freshwater to deltas and estuaries, salinity ingress and effects on fish and wetlands.
- Other concerns: contested 'surplus', climate change altering flows, huge cost, inter-State disputes and downstream neighbours Bangladesh and Nepal.
- Way forward: independent appraisal of each link, the Mihir Shah Committee's (2016) National Water Framework law, and cheaper options first: watershed development, rainwater harvesting, micro-irrigation and demand management.
Close with · River linking should be the last resort after a basin's own water is saved; appraised link by link, it can serve SDG 6 (water for all) without sacrificing the rivers themselves.
Add value (verified)
- National Perspective Plan: 30 link projects, 14 Himalayan and 16 peninsular.Features, Details and Status of Inter-Linking of Rivers — PIB, Ministry of Jal Shakti (2023) ↗“Under the two components of NPP, a total of 30 link projects have been identified; 14 link projects under Himalayan Rivers Development Component and 16 link projects under Peninsular Rivers Development Component.”
- Cabinet (8 December 2021) approved the Ken-Betwa link at Rs 44,605 crore, to be completed in eight years, with 103 MW hydro and 27 MW solar power.Cabinet approves Ken-Betwa Interlinking of Rivers Project — PIB (December 2021) ↗“Project shall cost of Rs.44,605 crore and shall be completed in 8 years Project to generate 103 MW Hydro Power plus 27 MW Solar Power”
- Ken-Betwa: irrigation to 10.62 lakh hectares in Chhatarpur, Panna, Tikamgarh (MP) and Banda, Mahoba, Jhansi (UP).Cabinet approves Ken-Betwa Interlinking of Rivers Project — PIB (December 2021) ↗“Project shall provide irrigation to 10.62 lakh hectares in the perennially drought prone area and water starved regions in Chhatarpur, Panna and Tikamgarh of Madhya Pradesh and Banda, Mahoba and Jhansi of Uttar Pradesh”
- The Mihir Shah Committee (constituted December 2015) suggested a draft National Water Framework Bill, 2016.National Water Framework Law — PIB, Ministry of Water Resources (2017) ↗“under the Chairmanship of Dr. Mihir Shah suggested a draft National Water Framework Bill, 2016”
Question: UPSC's CS (Main) 2017, GS Paper III — paper ↗. Approach: Minimalist IAS, checked 3 Oct 2026 (how we verify) — UPSC publishes no model answers. ·
Model answer· 224words · Minimalist IAS
The National Perspective Plan (1980) identified 30 links, 14 Himalayan and 16 peninsular, to move water from surplus to deficit basins; in December 2021 the Cabinet approved the first, Ken-Betwa, at Rs 44,605 crore.
Advantages of river linking
- Irrigation and drought relief: Ken-Betwa promises 10.62 lakh hectares in drought-prone Bundelkhand, from Panna to Jhansi.
- Flood moderation: storages on the Ganga-Brahmaputra system can temper floods in Bihar, Assam and eastern UP.
- Multiple uses: drinking water for 62 lakh people and 103 MW hydropower in Ken-Betwa; navigation elsewhere.
Possible impact on the environment
| Aspect | Promise | Risk |
|---|---|---|
| Water | 10.62 lakh ha irrigated | 'surplus' basins uncertain |
| Forests | 103 MW hydropower | Panna tiger habitat submerged |
- Submergence: dams drown forests and villages; Ken-Betwa's reservoir lies in the Panna tiger landscape.
- River health: altered flows, less silt and freshwater to deltas, salinity ingress, blocked fish migration.
- Contested science: 'surplus' is debatable and climate change shifts rainfall and glacier melt; inter-State disputes and downstream Bangladesh and Nepal add friction.
Way forward
- Appraise each link: independent environmental and social assessment first, within the National Water Framework law the Mihir Shah Committee (2016) proposed.
- Cheaper first: watershed development, rainwater harvesting, micro-irrigation and demand management.
River linking should be the last resort after a basin's own water is saved; appraised link by link, it can serve SDG 6 (water for all) without sacrificing the rivers.
Prepared by Minimalist IAS to the answer standard of Shivam Singh (mentor, 7 years) · facts checked against official sources (how we verify) · updated 3 Oct 2026. UPSC publishes no model answers: compare your structure and coverage with this, then write your own.







