Minimalist IAS
Sign upसाइन अप
2017 GS Paper III

UPSC CSE (Main) 2017 · GS Paper III · Question 7

India has achieved remarkable successes in unmanned space missions including the Chandrayaan and Mars…

UPSC Civil Services (Main) Examination 2017, General Studies Paper III (GS 3), Question 7 — 10 marks, 150 words.

Syllabus line: IT, space, robotics, biotech & IPR — “Awareness in the fields of IT, Space, Computers, robotics, nano-technology, bio-technology and issues relating to intellectual property rights.”

GS Paper III 2017 · Q7

10 marks · 150 words IT, space, robotics, biotech & IPR X-Ray · Core #30

India has achieved remarkable successes in unmanned space missions including the Chandrayaan and Mars Orbitter Mission, but has not ventured into manned space missions. What are the main obstacles to launching a manned space mission, both in terms of technology and logistics ? Examine critically.

Approach · directive: “what are the main obstacles / examine critically”

What it asks · Identify the technological and logistical hurdles to India's first human spaceflight, and weigh them against the case for going ahead.

It asks 2 things — answer each

  1. What are the main obstacles to a manned space mission, in technology and in logistics
  2. Examine critically: weigh the obstacles against the case for going ahead

Open with · Recent-event opening: on 5 June 2017 GSLV Mk III flew its first developmental mission, giving India a launcher heavy enough for a crew capsule; a crewed flight is a different order of challenge, since the payload must survive and so must the crew.

Cover

  • Launch vehicle: a human-rated rocket with near-zero failure tolerance; GSLV Mk III must be certified over repeated flights.
  • Crew module and return: heat shield, re-entry, parachute deceleration and sea recovery, tested once with the CARE capsule in 2014.
  • Life support and safety: air, water, temperature and radiation control, plus a crew escape system for launch aborts, neither flight-tested in 2017.
  • Logistics: astronaut selection and training, space medicine, crewed mission control, tracking network, recovery ships; a decade-long budget.
  • Critical view: the barrier is certification, reliability and funding, not raw capability; ISRO's launch, re-entry and deep-space experience is the base.
  • Case for it: spin-offs, prestige, inspiration for youth and space diplomacy; since 2017, Gaganyaan (2018, within Rs 10,000 crore), the TV-D1 abort test (2023) and Shubhanshu Shukla's ISS flight (2025) show the obstacles are being cleared.

Close with · A phased, safety-first programme has turned the obstacles of 2017 into milestones; the roadmap now runs to a Bharatiya Antariksh Station by 2035 and an Indian crewed lunar mission by 2040.

Add value (verified)

  • ISRO's Gaganyaan project (after 2017) aims to fly a crew of three to a 400 km orbit for three days and bring them back to a landing in Indian waters.Gaganyaan — ISRO ↗“Gaganyaan project envisages demonstration of human spaceflight capability by launching crew of 3 members to an orbit of 400 km for a 3 days mission and bring them back safely to earth, by landing in Indian sea waters.”
  • GSLV Mk III's first developmental flight (GSLV MkIII-D1) launched GSAT-19 on 5 June 2017.First Developmental Flight of India's GSLV Mk III successfully launches GSAT-19 — PIB, Department of Space ↗“The first developmental flight (GSLV MkIII-D1) of India's heavy lift launch vehicle GSLV Mk-III was successfully conducted today (June 05, 2017)”
  • Cabinet (December 2018): Gaganyaan's total fund requirement is within Rs 10,000 crore; two unmanned flights and one manned flight.Boost to India's Space Program: Cabinet approves Gaganyaan — PIB (28 December 2018) ↗“The total fund requirement for the Gaganyaan Programme is within Rs.10,000 crore and includes cost of technology development, flight hardware realization and essential infrastructure elements. Two unmanned flights and one manned flight will be undertaken”
  • TV-D1 (18 October 2023) demonstrated the in-flight abort of the Crew Escape System at Mach 1.2.Gaganyaan TV-D1 Mission — ISRO ↗“TV D1 Test Flight is accomplished. Crew Escape System performed as intended. Mission Gaganyaan gets off on a successful note. October 18, 2023”
  • Group Captain Shubhanshu Shukla completed an 18-day mission aboard the ISS, launched 25 June 2025.Cabinet resolution welcoming return of Group Captain Shubhanshu Shukla — PIB (2025) ↗“following the successful completion of his historic 18-day mission aboard the International Space Station. Launched on 25th June 2025, with Group Captain Shubhanshu Shukla as Mission Pilot”
  • Space vision for the Amrit Kaal: operational Bharatiya Antariksh Station by 2035 and an Indian crewed lunar mission by 2040.Bharatiya Antariksh Station: first module in 2028 — PIB, Cabinet (September 2024) ↗“creation of an operational Bharatiya Antariksh Station by 2035 and Indian Crewed Lunar Mission by 2040”

Question: UPSC's CS (Main) 2017, GS Paper III — paper ↗. Approach: Minimalist IAS, checked 3 Oct 2026 (how we verify) — UPSC publishes no model answers. ·

Model answer· 222words · Minimalist IAS

On 5 June 2017 GSLV Mk III flew its first developmental mission, giving India a launcher heavy enough for a crew capsule. A crewed flight is a different order of challenge: the payload must survive, and so must the crew.

Technological obstacles

  • Human-rating: near-zero failure tolerance proven over repeated launches.
  • Re-entry and recovery: heat shield, parachutes and sea recovery, tested only once with the CARE capsule (2014).
  • Life support and escape: environmental control and a crew escape system, neither flight-tested in 2017.

Logistical obstacles

  • People and ground: astronaut selection, space medicine, crewed mission control, tracking network, recovery ships.
  • Money: a decade-long budget against pressing development needs.

Critical examination

2014CARE capsule2017GSLV Mk III-D12018Gaganyaanapproved2023TV-D1 aborttest2025Shukla on theISS
  1. 2014: CARE capsule
  2. 2017: GSLV Mk III-D1
  3. 2018: Gaganyaan approved
  4. 2023: TV-D1 abort test
  5. 2025: Shukla on the ISS
  • Capability exists: heavy launcher, re-entry test and deep-space navigation from Chandrayaan-1 and the Mars Orbiter Mission; the barrier is certification and funding, not science.
  • Case for going ahead: spin-offs, prestige, youth inspiration and space diplomacy.
  • Since then: Cabinet approved Gaganyaan (2018, within Rs 10,000 crore, three-member crew); the crew escape system passed abort test TV-D1 (2023); Shubhanshu Shukla flew an 18-day ISS mission (2025).

A phased, safety-first programme has turned the obstacles of 2017 into milestones; the roadmap now runs to a Bharatiya Antariksh Station by 2035 and an Indian crewed lunar mission by 2040.

Prepared by Minimalist IAS to the answer standard of Shivam Singh (mentor, 7 years) · facts checked against official sources (how we verify) · updated 3 Oct 2026. UPSC publishes no model answers: compare your structure and coverage with this, then write your own.

Cite this question: UPSC CSE Mains GS-3 2017, Q7 — minimalistias.com/pyqs/mains/2017/gs3/q7 Discuss on WhatsApp

Write it now · 7 minutes for 150 words, by hand, as in the exam 07:00
Free · 3 answers on us Write this answer — get it evaluated free Handwrite it in 150 words, scan it into one PDF, and get a score and remarks from a mentor within 72 hours. Write it

Also asked on this syllabus line

All questions on IT, space, robotics, biotech & IPR →

Build the base: Prelims PYQs on this

Free · Daily Updates Join Minimalist IAS on Telegram or WhatsApp A PYQ every morning, the Daily Brief and the Sunday quiz. Free, no sign-up. Join Telegram Join on WhatsApp →